How Much Would Calvin's Concrete Company Charge for 32 Cubic Yards of Concrete?

What is the cost of 8 cubic yards of concrete supplied by Calvin's Concrete Company?

$596.00

What is the rate per cubic yard charged by Calvin's Concrete Company?

$74.50 per cubic yard

How much would Calvin's Concrete Company charge for 32 cubic yards of concrete?

Calculate the cost based on the rate per cubic yard.

Answer:

Calvin's Concrete Company would charge $2,384.00 for 32 cubic yards of concrete.

To determine the cost of 32 cubic yards of concrete from Calvin's Concrete Company, we first need to understand the cost of 8 cubic yards. The company supplied 8 cubic yards of concrete at a cost of $596.00. This information allows us to calculate the rate per cubic yard.

By dividing the total cost of $596.00 by the number of cubic yards (8), we find that the rate per cubic yard is $74.50.

Now, to find the cost of 32 cubic yards, we can simply multiply the rate per cubic yard ($74.50) by the number of cubic yards (32). The calculation would be: $74.50 per cubic yard x 32 cubic yards = $2,384.00.

Therefore, Calvin's Concrete Company would charge $2,384.00 for 32 cubic yards of concrete at the same rate per cubic yard as the initial supply of 8 cubic yards.

← Exploring unacceptable permit required confined space entry conditions Calculate total power consumption of home automation system →